Flat Roofing in Southery - The Job from First Look to Finished Roof

If you need a flat roof replaced or repaired in Southery, here is exactly what the job involves from the moment we arrive to the point we leave the site tidy.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01366 312325
Flat Roofing · Southery

Expert Flat Roofing
in Southery

Flat Roofing in Southery

Downham Market Roofers carry out flat roof installations and repairs on garages, extensions, and outbuildings in Southery and the wider area, including Stoke Ferry, Stradsett, Watlington, Shouldham, and Wormegay. A methodical process is the best way to approach any flat roofing job. Understanding that process helps you know what to expect and what questions to ask at each stage.

This page walks through a full flat roof replacement step by step, using an extension or garage as the most common example. Repair jobs follow a shorter version of the same sequence.

Step 1: The Initial Survey

A flat roof survey is not a formality. Before any price can be given honestly, a roofer needs to see the existing covering, check the falls across the surface, inspect the edge details and any upstands where the roof meets a wall, and assess whether the decking beneath is sound.

Access matters at this stage. A garage roof is usually straightforward to reach safely. An extension roof adjoining a two-storey wall may require a ladder and careful positioning. If the survey reveals decking that feels soft or spongy underfoot, that tells us moisture has already penetrated the build-up, and the scope of the job needs to account for board replacement as well as a new membrane.

At the end of the survey, you should receive a clear explanation of what was found, what is being recommended, and why. If a roofer cannot explain what they found, that is worth noting before you commit.

Step 2: Stripping Back the Old Covering

On a replacement job, the old felt or membrane comes off first. Stripping back to the deck is the right approach in most cases because it allows a proper inspection of every board and exposes any pockets of retained moisture.

The stripped material needs to be removed from the site promptly. Old felt is heavy and can hold water, so it should come down in manageable sections and be cleared into a skip or suitable disposal vehicle. A roofer leaving old felt on the ground around your property for days is a sign the job is not being managed well.

Step 3: Inspecting and Repairing the Deck

Once the old covering is off, the deck boards are checked individually. Flat roof decks are most commonly built from oriented strand board (OSB) or exterior-grade plywood. Any board that has swollen, delaminated, or taken on visible moisture is cut out and replaced with new exterior-grade material of the correct thickness, usually 18mm for a standard residential flat roof.

Skipping this step, or attempting to dry out and reuse softened boards, is a false economy. A new membrane laid on a compromised deck will fail at the weak points within a few years.

At this stage the drainage falls are also confirmed. A flat roof is not truly flat: it needs a minimum fall of 1:80 across the surface to drain water to the outlets. If the existing structure does not provide sufficient fall, tapered insulation can be used to create it as part of a warm roof build-up.

Step 4: Insulation (Where Applicable)

On a full replacement, insulation is worth considering carefully. The current standard for a warm flat roof involves laying rigid PIR insulation boards above the deck and beneath the waterproof membrane. This keeps the structural elements of the roof warm and dry, avoiding the condensation risk associated with older cold roof designs where insulation sits between the joists.

The insulation boards are fixed or bonded to the deck, joints are staggered to reduce cold bridging, and the thickness is chosen to meet the target U-value. A 100mm PIR board is a typical starting point, though the right thickness depends on the existing build-up and the heat loss calculation for the room below.

If insulation is not part of the scope, the deck is prepared and primed ready for the membrane.

Step 5: Laying the Membrane

The two systems we install are EPDM rubber and torch-on SBS felt. The installation process differs between them.

For EPDM, the sheet is cut to size, positioned over the deck, and then a bonding adhesive is applied to both the underside of the membrane and the deck surface. The sheet is carefully rolled back and the two adhesive surfaces are brought together without trapping air. Edges are turned up at upstands and secured with EPDM-compatible tape and termination bar. On a small roof, a single sheet with no mid-roof seams is the ideal.

For torch-on felt, the base layer is nailed or bonded to the deck, and the cap sheet is applied using a gas torch to heat the underside of the felt and fuse it to the layer below. This process is done in controlled passes to avoid overheating. Edge details are dressed down over timber or metal fascia trims, and upstands are taken up the wall to a height of at least 150mm before being tucked into a chase or covered with a compatible flashing.

Step 6: Edge Trims, Upstands, and Flashings

The perimeter of a flat roof is where most failures begin. Edge trims hold the membrane firmly at the roof edge and give a clean, weathertight finish. Upstands where the roof meets a wall must be high enough (a minimum of 150mm above the finished roof surface) and the top of each upstand must be sealed to prevent water tracking behind it.

Where a flat roof meets a cavity wall or rendered surface, lead or aluminium flashing is let into a chase cut in the masonry and pointed back in. A flashing that is simply stuck against the wall surface with mastic alone will not hold long-term. The chase and pointing are what make it weathertight.

Step 7: Checking Drainage Outlets

Before the job is signed off, every drainage outlet is checked. Outlets should be clear, seated correctly within the membrane, and positioned at the lowest point of each drainage fall. A properly installed EPDM or felt outlet collar bonds to the membrane surface to prevent water from tracking between the outlet body and the membrane. Any debris cleared during the job is removed from the outlet and its surrounds.

Step 8: Clean-Up and Handover

A finished flat roof job should leave the site clean. Offcuts, old felt, packaging, and any replaced decking boards go off-site. The area around the building is cleared of debris before we leave.

At handover, you should be told what material has been installed and given any documentation relating to the material itself. You should also be told what maintenance is needed: for EPDM, that mostly means keeping the outlets clear and avoiding concentrated foot traffic without protection. For torch-on felt, an annual visual check for surface crazing or edge lifting is worth doing.

Book a Flat Roof Survey in Southery

If your flat roof is leaking, showing signs of age, or you simply want to know what condition it is in, call Downham Market Roofers and ask for a flat roof survey. We cover Southery and nearby places including Stoke Ferry, Watlington, Shouldham Thorpe, Swaffham, and South Wootton. We will walk you through exactly what we find before any work is agreed.

Why choose Downham Market Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.