When lead flashing fails around a chimney or dormer in Southery, Downham Market Roofers carries out the full job properly - from the initial inspection right through to clearing up and leaving your roof weathertight.
Call any time. Calls are answered day and night and passed straight to our roofers.
Lead is the material used to seal the joints where your roof meets a vertical surface - a chimney stack, a dormer wall, a parapet, or the line where two roof slopes meet in a valley. Without a sound lead seal at these points, rainwater tracks down behind tiles or into the roof structure, often without being obvious inside the house until real damage has built up.
Lead has been used in roofing for centuries because it is dense, malleable, and long-lived. A correctly fitted lead flashing, properly stepped or soaked into the mortar joints of a chimney and dressed tight to the tile or slate surface, will perform reliably for several decades. The failure is almost always in how it was fitted, or in natural deterioration of the mortar, rather than in the lead material itself.
The most typical sign is a damp patch on an internal wall or ceiling near a chimney breast, particularly after heavy rain or when rain is driven by wind. Staining on wallpaper or plaster around a chimney or below a dormer window is worth investigating rather than redecorating over.
On the roof itself, you may be able to see cracked or crumbling mortar where lead flashing is tucked into the brickwork, lead that has lifted away from the masonry, or sections of flashing that have slipped downward. Oxidised lead takes on a grey-white surface colour and becomes less flexible, which is a natural process, but if the lead has split or buckled it needs replacing rather than patching.
Understanding what a proper lead work job involves helps you assess any quote you receive and know what questions to ask. Here is how a complete lead flashing job is carried out from the moment we arrive to the moment we leave.
Before any materials are ordered or work begins, the area needs a proper look. For chimney flashing, that means getting on the roof and looking at every face of the stack - front apron, stepped side flashings, back gutter, and soakers if the roof is slated or tiled with small plain tiles. A visual check from the ground tells you very little about the condition of the mortar joints or whether the lead has lifted behind a ridge tile.
The inspection also covers the surrounding roof surface. Damaged tiles adjacent to a chimney, or slipped slates near a dormer, often contribute to water entry and need to be dealt with at the same time. Fixing the flashing alone will not stop a leak if there is a cracked tile an inch away from it.
If there is active damp inside the property, we check where the water is most likely tracking. Water does not always enter exactly where it appears inside - it can travel along a rafter or batten before dripping through a ceiling some distance from the actual gap.
Old flashing that has failed needs to come off cleanly before new lead is fitted. Mortar that has been used to bed the top edge of flashing into a chase or joint in the brickwork is raked out. Where soakers are present alongside stepped flashings on a chimney, each soaker is lifted individually from between the slates or tiles.
This stage also reveals whether the brickwork itself has deteriorated. A chimney stack on an older property can develop loose or spalled bricks around the flashing line, and if that is not addressed before new lead is fitted, the new flashing will fail in the same way as the old one. Any repointing of the stack or repair to the lead chase is dealt with before the new lead goes in.
Lead for roofing is supplied in rolls of different thicknesses, referred to by code numbers. Code 4 is typically used for flashings and soakers; code 5 is used where a slightly thicker sheet is appropriate, such as a wide back gutter behind a chimney. The correct code matters - lead that is too thin will be prone to cracking over time, particularly where it needs to flex across an uneven surface.
Each section is cut to length on site and dressed by hand using a bossing mallet or dresser to work the lead into the profile of the underlying surface. A stepped flashing on a chimney is cut in a series of overlapping steps that follow the mortar joints of the brickwork, with each step typically set at around 150mm. The lead is folded back at the top to sit into a raked-out mortar joint or a pre-cut chase.
Valley flashings require the lead to be formed into a channel shape that guides water from both slopes down to the gutter. The lead is overlapped at joints by at least 150mm to prevent any water from tracking back up between sections. For longer valleys, separate sections are used rather than one continuous sheet, because lead expands and contracts with temperature changes and a very long single piece will buckle.
The top edge of each flashing is fixed into the mortar joint using lead wedges driven in at regular intervals. New mortar is then pointed over the top to hold everything in place and stop water from getting in above the flashing. The mortar mix needs to be appropriate for the age and type of brickwork - a hard cement mix used on older soft brick can cause the brick to crack as it moves.
Where a front apron flashing meets tiles or slates, the bottom edge of the lead is dressed down over the surface and in some cases clipped to prevent wind lift. On chimney stacks, a separate saddle piece or back gutter takes water away behind the stack and into the roof slope. These individual components have to lap correctly over one another so that any water which does get behind one layer is picked up by the next.
Once all the lead is in place, the mortar pointed, and any displaced tiles or slates refixed, the completed area is checked carefully. Every joint and overlap is looked at, and the lead is pressed tight to the surface it sits against. Any section of new lead that bridges an uneven surface without being fully dressed down is a potential entry point for water.
If there are any tile or slate repairs in the same area, these are checked for correct alignment and that no gaps have been left at laps. The gutters or valleys leading away from the flashing area are also checked to make sure nothing has been displaced during the work.
Old lead, off-cuts, used mortar and any other debris are removed from the roof and from the property. Old lead in reasonable condition can be recycled - it has scrap value. Any tiles or slates that were removed and replaced are taken away if they are broken, or kept for the homeowner if they are in good condition and useful as spares.
A full chimney re-flash involves several separate pieces of lead: a front apron at the lower face of the stack, stepped flashings up each side following the slope of the roof, soakers slipped under each individual tile or slate course on the sides, and a back gutter behind the stack. This is one of the more involved lead work jobs and takes longer than simply replacing a single piece of flashing.
On some older properties, lead was substituted with mortar fillets - a wedge of cement used in place of proper metal flashing. Mortar fillets crack and fail, and replacing them with correctly fitted lead is the proper repair rather than re-applying more mortar.
Dormers have lead at the cheeks (the sides), at the junction between the dormer wall and the main roof slope, and often at a horizontal apron below the dormer window itself. Lead on dormer cheeks is often laid in a fully dressed sheet, bossed into shape to follow the geometry of the cheek without gaps.
Open lead valleys are common on older roofs and give a clean, reliable gutter between two roof slopes. A correctly laid valley has enough width of lead visible on either side to handle the volume of water that runs from the slopes above it without overflowing into the tile or slate courses.
Lead work costs depend on the size and complexity of the job. A simple single flashing repair - for example, refixing and repointing a front apron on a chimney that has lifted - might cost in the range of £150 to £300. A full chimney re-flash involving all four faces, new soakers, and new back gutter is a more involved job and typically falls in the range of £600 to £1,200 or more depending on stack height, roof pitch, and access.
Lead itself is priced by the kilogram and costs more than most other roofing materials. The lead code and sheet width needed for a given application directly affect material costs. Valley flashings on a larger roof can use a significant quantity of lead and are priced accordingly. Scaffolding or a tower, if required for safe access, is a separate cost that will be explained before any work starts.
Any quote you receive for lead work should specify which components are being replaced, what lead code will be used, and whether the price includes repointing the mortar above the flashing. A quote that simply says "repair chimney flashing" without any further detail is worth querying before you accept it.
Based in Downham Market, we carry out lead work across the surrounding area including Southery and the nearby villages and towns. We also cover King's Lynn, Downham, East Winch, and across into Wisbech and Lakenheath where the job requires it.
If you are getting quotes from more than one roofer - which is sensible for any job of this size - there are a few specific questions that will help you compare them properly.
A roofer who can answer these questions clearly and specifically is likely to carry out the work to a proper standard. Vague answers about any of these points are worth probing further before you commit.
If you have noticed damp near a chimney or dormer, or you can see that flashing has lifted or the mortar has crumbled, call Downham Market Roofers to arrange a roof survey. We will look at the affected area properly and give you a clear explanation of what needs doing and why, before you decide anything. Call us to book a survey for your property in Southery or the surrounding area.
No obligation · We'll call you to arrange a free visit
Call any time. Calls are answered day and night and passed straight to our roofers.