Urgent leak or storm damage? Call 01366 312325 - answered day and nightUrgent leak? Call 01366 312325
Downham Market Roofing Specialists
01366 312325 Get a Quote →

Roof Replacements in Southery

Downham Market Roofers replaces roofs in Southery from start to finish - here is exactly what that process involves, at every stage of the job.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01366 312325
Roof Replacements · Southery

Expert Roof Replacements
in Southery

What Actually Happens During a Roof Replacement

A lot of homeowners have only a vague idea of what a roof replacement involves beyond "take the old one off, put a new one on". Knowing what to expect at each stage helps you ask the right questions, judge whether the work is being done properly, and avoid being caught out by surprises mid-job.

Here is how a pitched roof replacement typically runs from first contact through to the day the scaffolding comes down.

Stage One - The Initial Survey

Before any work is priced or planned, the roof needs to be looked at properly. A survey from ground level using binoculars gives a general picture, but a proper inspection means getting up onto the roof and into the loft space.

From the roof, we are looking at the tile condition, the state of the ridge and hip mortar, the leadwork at chimneys and abutments, and whether the verge and eaves detail is sound. From inside the loft, we are checking the underlay for brittleness and tears, the battens for rot, and the rafters and other timbers for any signs of wet rot, woodworm or structural movement.

The survey outcome determines the scope of work. A straightforward replacement on a sound structure is a different job from one where timbers need attention before the new roof can go on. Both outcomes are worth knowing before you commit.

Stage Two - Scaffolding

Safe access is not optional. A full scaffold - not just a ladder - is needed for a roof replacement. The scaffold needs to be erected correctly, with toe boards and guardrails, and it should be stable enough to allow materials to be stacked on it safely.

Scaffolding typically goes up one to two days before stripping begins. It stays in place until the roof is complete and has been signed off - do not let anyone pressure you into having it taken down before the work is fully finished and inspected. The scaffold also protects your gutters, fascias and anything below from falling material during the strip.

Stage Three - Stripping the Old Roof

Stripping means removing everything down to the bare rafters: tiles or slate, battens, and underlay. Materials come down carefully and are loaded directly into a skip or onto a waste vehicle. Old lead is usually separated and recycled.

This is the stage where the true condition of the timbers becomes clear. Wet rot in a rafter or batten often does not show itself until the covering is off and you can poke at the wood. Any timber issues found at this point need to be dealt with before moving on - there is no point laying a new roof over rotten wood.

The strip also reveals the full condition of the roof deck if there is one (flat roof sections), and shows up any previous botched repairs, hidden patches of felt or unauthorised fixings that earlier owners may have added.

Stage Four - Timber Repairs

Not every roof replacement involves timber repairs, but many do, particularly on older properties. Common issues include rotten rafter feet (the lowest part of the rafter, near the eaves, where water tends to collect), split or undersized battens, and damaged or missing noggins between rafters.

Repair work uses treated structural timber. Where a section of rafter is rotten, it is often possible to sister a new piece alongside the existing timber and fix them together, which avoids the more disruptive work of replacing a full rafter. Where rot is more extensive, full replacement may be needed.

Any timber repairs should be completed and checked before the new covering starts. Trying to rush this stage to save time on the overall job is a false economy.

Stage Five - Laying the New Underlay and Battens

Modern roofs use a breathable membrane underlay rather than the old-style bitumen felt. Breathable underlay allows water vapour from inside the property to pass through rather than condensing under the tiles. It is laid from eaves to ridge, lapped at joints and fixed at the edges.

Treated timber battens go over the underlay. The gauge (spacing) of the battens is determined by the tile being used - each tile type has a specified maximum gauge to ensure proper overlap and water exclusion. Using the wrong gauge is a common cause of early roof failure on poorly supervised jobs.

Stage Six - Tiling

Tiles are laid from the bottom of the roof upwards, starting at the eaves course. Each tile hooks over the batten and, depending on the tile type and roof pitch, may also be mechanically fixed with nails or clips. Current guidance requires tiles in exposed positions - particularly the eaves, verges and ridge - to be fixed regardless of pitch.

Valleys, where two roof slopes meet, are detailed with lead or a purpose-made valley trough. Ridge tiles are either mortar-bedded or dry-fixed using a proprietary ridge system. Dry-fix ridge systems are increasingly common because they do not rely on mortar remaining sound over decades. Hip tiles are similarly fixed and pointed or dry-hip detailed.

Flashings at chimneys, skylights and abutment walls are cut and dressed in lead. Code 4 lead is the standard specification for most flashings; Code 5 is used where greater durability is needed. Soakers (individual lead pieces between tiles and abutment) are fitted before the tiles go on in that area.

Stage Seven - Finishing Details and Inspection

Once the tiling and flashings are complete, the ridge is finished, the verge edge tiles are pointed or clipped, and the eaves are checked to confirm tiles are sitting correctly and not bridging the gutter. We also check that there is clear airflow at the eaves into any roof ventilation system.

Gutters and fascias are inspected as part of this check. If a fascia board has rotted during the job, it is far easier to replace it now than after the scaffold is down.

Stage Eight - Clean-Up and Scaffold Strike

All old materials, packaging and off-cuts are cleared from the site before the scaffold comes down. Skips are removed, paths and drives are swept, and any material that has landed in gutters is cleared out. The scaffold is struck once the roof is complete and we are satisfied everything is right.

A walk-around at the end of the job lets you see the finished roof from the ground and raise any questions before we leave site.

We Work in Southery and Across the Area

We carry out roof replacements in Southery and across the wider area including Stoke Ferry, Shouldham Thorpe, Shouldham, Stradsett, Watlington, West Acre, Wormegay, West Walton, Walpole and South Wootton. The process is the same wherever we work - a proper survey first, the right materials for the property, and a thorough clean-up at the end.

To arrange a survey on your property in Southery, call us directly. We will tell you what we find, what the work involves, and what it will cost before anything is agreed.

Why choose Downham Market Roofers?

  • Free survey and itemised quote
  • Fixed price - no surprises
  • Local team

Get your free quote

No obligation · We'll call you to arrange a free visit

By submitting you agree to being contacted about your enquiry. No spam, ever.

Urgent leak or storm damage?

Call any time. Calls are answered day and night and passed straight to our roofers.

Call now: 01366 312325